by chris | Nov 25, 2021 | Recovery (Old)
We were asked to install a zappi v2 made by the British manufacturer MyEnergi. The connected SWA cable using IP68 gland properly earthing the armour at both ends of the cable. We protected the cable using 32A Type B MCB without RCD protection. The zappi unit includes...
by chris | Jan 6, 2020 | Recovery (Old)
Panel lighting LED Often installed in commercial offices in floating ceilings, panel lights are an efficient and effective way of flooding a space with lighting. These lights were upgrading a 20 year old office. This brought the lighting in the office up to date and...
by chris | Jun 30, 2019 | Recovery (Old)
Our customers were building a new extension with Ellershaw Builders All lighting, cables and three way switching was installed for 17 down lights. Plugged in Electricians consulted with the customer to get the right lights in the right places. Plugged In...
by chris | Jun 11, 2017 | Recovery (Old)
Our customers were building a new extension with Ellershaw Builders All lighting, cables and three way switching was installed for 17 down lights. Plugged in Electricians consulted with the customer to get the right lights in the right places. Plugged In...